Johns Creek & North Fulton
Whole-Home Remodeling in Johns Creek, GA
About 85 percent of Johns Creek homes were built between 1980 and 2009, according to Census survey data. Many have good bones and dated interiors. A whole-home remodel updates several rooms under one plan, one schedule and one point of contact.

- Step 1Discovery & Consultation
- Step 2Design & Scope
- Step 3Construction
- Step 4Punch List & Walkthrough
| Decade built | Share of homes |
|---|---|
| 1980-1989 | 22.7% |
| 1990-1999 | 45.1% |
| 2000-2009 | 17.4% |
| 2010-2019 | 8.8% |
| 2020 or later | 1.5% |
| Before 1980 | 4.4% |
Source: U.S. Census Bureau, American Community Survey 2019-2023 5-year estimates (via Point2Homes).
When a whole-home plan makes sense
If you want to update the kitchen, two or more bathrooms and the floors, doing them as one coordinated project avoids tearing out new work later. Flooring can run continuously, electrical and plumbing changes are planned together, and you live through one construction period instead of several.
- Kitchen and family room opened into one space.
- Primary bath and hall baths updated together.
- Formal living or dining room converted to an office or playroom.
- Continuous flooring across the main level and stairs.
- Interior doors, trim, lighting and paint refreshed throughout.
Planning, phasing and living at home
Some homeowners stay in the house and phase the work room by room; others move out for the most disruptive weeks. We plan phases around access to a working kitchen and bathroom, and we schedule selections so materials arrive before each trade starts.
Cost drivers
| Factor | Why it matters |
|---|---|
| Number of rooms | Each kitchen and bath adds cabinetry, plumbing and tile labor |
| Structural changes | Wall removal needs beams, engineering and inspections |
| Flooring area | Continuous floors are priced by square footage, including stairs |
| Systems | Older electrical panels or HVAC may need updates to support the plan |
| Finish level | Cabinet lines, counters and fixtures vary widely |
Willowcrest planning guide.
Industry estimates for whole-home renovation in the Atlanta area commonly fall in a wide per-square-foot range depending on scope and finish level. Because two homes of the same size can differ greatly in what they need, we prepare an itemized estimate after an in-home visit rather than quoting by the square foot.
Permits and timeline
In Johns Creek, building permits are issued by the City of Johns Creek Community Development Department, Building Division. The division can be reached at 678-512-3250 or BuildingPermits@JohnsCreekGA.gov, and pre-application consultations are available at City Hall. Requirements depend on the exact scope, so we confirm them for each project before work starts. Whole-home projects usually run several months from demolition to final walkthrough, depending on scope and selections.
Why many Johns Creek homes suit a whole-home plan
According to U.S. Census Bureau data, about 45% of Johns Creek homes were built in the 1990s and another 23% in the 1980s. Homes from those years often share the same set of dated features at once: closed kitchens, large formal rooms that go unused, primary baths with garden tubs, carpet across most floors and builder-grade trim. When several rooms need work, one plan usually costs less and causes less disruption than a series of separate projects.
How we put the plan together
- Walk every room with you and list what you want to change, keep or postpone.
- Identify work that has to happen together, such as flooring that runs between rooms or a wall that affects the kitchen and family room.
- Price the full scope with each area as its own section, so you can phase or trim it.
- Agree on a schedule that keeps at least one bathroom and a working kitchen setup available if you stay at home.
Selections and decisions
A whole-home project involves many selections: flooring, cabinets, counters, tile, plumbing fixtures, lighting, paint and hardware. Making these decisions early, before demolition, is the single best way to keep the schedule. We give you a selection list with deadlines tied to the schedule so nothing holds up the crew.
Timeline factors
Duration depends on the number of rooms, whether structural or mechanical changes are involved, permit and inspection timing, and lead times on cabinets and special-order materials. Your written estimate includes a phase-by-phase schedule, and we update it if the scope changes.
What a whole-home estimate includes
Each room or area is priced as its own section with demolition, framing, mechanical work, finishes and cleanup listed. Allowances are shown for items you have not chosen yet. Shared costs, such as permits, dumpsters and site protection, appear once. This lets you see what each part of the project costs and decide whether to phase or trim it.
Whole-home remodeling FAQs
Can we live in the house during a whole-home remodel?
Many families do, especially when the work is phased. Some choose to move out for the most disruptive phase, such as when the kitchen and primary bath are both under construction. We discuss the options during planning.
Should we do everything at once or in phases?
Doing it at once is usually faster and avoids repeating setup and cleanup. Phasing spreads out cost and disruption. We price both ways when it helps you decide.
Do whole-home projects need permits?
Any structural, electrical, plumbing or mechanical changes typically need permits from the Johns Creek Building Division. We prepare the applications and schedule inspections.
How do you handle surprises behind the walls?
We recommend a contingency in the budget. If we find something unexpected, we stop, show you, and give you a written change order with the cost before continuing.
Planning several rooms at once? Talk with us about a whole-home plan.
Related services and guides
Serving Johns Creek, Alpharetta, Duluth, Suwanee, Milton, Peachtree Corners, Georgia.